Assembly and installation
The following points must be inspected and checked to make sure that the controller is assembled in
a proper and professional manner:
-
Assembly of the controller must only take place indoors on a dry, vibration-free and flat surface.
Make sure that the maximum permissible load of walls and attachments has not been
exceeded.
-
Any unused cable glands must be sealed in order to comply with the required IP value.
-
Wires must have the following properties:
o
Flame retardant in accordance with IEC 60332-1-2
o
Prevent spread of flames in accordance with IEC 60332-3-22, IEC 60332-3-24/IEC
60332-3-25
o
Halogen-free in accordance with IEC 60754-1
o
Corrosivity combustion gases in accordance with IEC 60754-2
o
Low smoke density in accordance with IEC 61034-2
-
The phase(s) in the power supply (3N~400Vac/3~230Vac/1N~230Vac-50Hz, +/-10%) must be
protected against short circuit and overload via a suitable fuse or 16A circuit breaker type B.
-
The following applies if the power cable has a 5-pin 16A CEE plug (3 phases, neutral & ground) or
a 3-pin 16A CEE plug (1 phase, neutral & earth): install the 16A power socket in a clearly visible
and accessible location (so that power can be cut in case of emergencies) in the immediate
vicinity of the controller and cut off the power in accordance with applicable
standards/guidelines. Once the controller and the power cable with power socket have been
installed, make sure that all screws have be properly tightened and that everything has been
connected correctly.
-
The installation engineer must compile a risk analysis for the whole installation. In this case,
make sure the door in question is properly secured because there is a risk of people and objects
being crushed.
-
The installation must at least comply with all European and legal legislation and standards.
-
Safety switches, mechanical stops or other safety systems must be used to prevent the door
from overshooting the furthest setting.
-
The technical details of any implemented external components, such as e.g. photo cells, must be
checked. They must not cause the maximum permissible load of the controller to be exceeded.
-
Firmly tighten the cable glands so that the strain placed on the inserted cable is reduced.
-
Make sure that the mains power cable is not damaged. If this is damaged, replace it with an
original cable from the manufacturer.
-
An inspection must be carried out by the designated installation engineer when commissioning
the system.
The following must be done during this inspection:
•
A list must be filled in for approved and connected components.
•
Documents that accompany all the components must be stored together with this
manual.
•
The interaction between all components must be tested by simulating a fire or by
activating the test input (if configured in the menu).
•
A test must be carried out to check if the system allows the door to close in the event
of component malfunctions (for example, by removing a detector, cutting the power
or other such actions).
•
Finally, check if all components have been installed as described in the accompanying
manual.