3-16
Pre-Start Inspection and Operation
4. When the machines mounting plates top edge is seated in the attachment mounting plate, curl
the machines mounting plate backwards slightly to allow the lower edge of the machines
mounting plate to slide into position. See
.
Figure 3–21 Attachment Installed
5. Shut the engine off.
6. Rotate the attachment lock pins (Item 1,
) into the
locked position, securing the attachment to the machine.
Figure 3–22 Attachment Locks in Locked Position
7. Test the security of the attachment connection by fully lowering with loader arm and tilting
the attachment downwards until the front end of the tracks lift slightly off the ground.
1
2113
1
1
2022
Pins Locked
Summary of Contents for Boxer 999-935
Page 2: ......
Page 6: ...iv Mertz Manufacturing LLC P O Box 150 Ponca City OK 74602 Affix Stamp Here...
Page 8: ...vi...
Page 18: ...1 8 Safety Precautions...
Page 26: ...2 8 Operating Controls...
Page 52: ...3 26 Pre Start Inspection and Operation...
Page 82: ...5 6 Troubleshooting...
Page 83: ......