3-10
Pre-Start Inspection and Operation
Transportation
1. Move the throttle control lever to the mid-range engine speed and set the transport speed to
the LOW range. Raise the attachment so that it will clear the ramp of the transport trailer.
NOTE:
The longer the attachment, like the trencher, the more the attachment needs to either
be tilted or raised. It is recommended to back the machine onto the transport trailer and
position the machine so that the heaviest weight (center of balance) is towards the front
(hitch end) of the trailer. See
.
The Boxer is designed for maximum working balance. When traveling on an incline,
always have the heaviest portion of the machine pointing uphill.
2. Follow general load carrying safety. Always carry the heaviest load pointing uphill.
NOTE:
When operating without an attachment, the operator becomes the load.
Figure 3–10 Transport Position on Trailer
3. When the machine is positioned on the trailer properly, lower the attachment to the trailer deck.
4. Shut the engine off and remove the key.
5. Secure the unit to the transport vehicle with DOT (Department of Transportation) approved
chains, binders, and DOT guidelines. Make sure to use the appropriate tie-down locations on
the machine and trailer.
NOTE:
• Never tow or pull the machine. Damage to the hydraulic motors could result.
• If the machine is totally in-operable, using lifting straps or cables and a machine that can
safely lift 4,000 lbs (1820 Kg), lift the machine and place on a trailer.
Machine Travel Controls
• Levers and controls should return to the neutral position when they are released.
• Make sure that all of the controls are in the neutral (middle) position before starting the
engine.
• Operate the controls gradually and smoothly. Excessive speed and quick control movements
without regard for working conditions could cause an unsafe situation.
• Make sure to maintain your grip on both of the hand grips any time the machine is in motion.
CAUTION
2019
WARNING
Summary of Contents for Boxer 999-935
Page 2: ......
Page 6: ...iv Mertz Manufacturing LLC P O Box 150 Ponca City OK 74602 Affix Stamp Here...
Page 8: ...vi...
Page 18: ...1 8 Safety Precautions...
Page 26: ...2 8 Operating Controls...
Page 52: ...3 26 Pre Start Inspection and Operation...
Page 82: ...5 6 Troubleshooting...
Page 83: ......