P 9
Please retain product label and instructions for future reference
24
28
29
Step 13
Parts needed - No. 24 QTY 6
No. 25 QTY 12
No. 27 QTY 6
No. 28 QTY 12
No. 29 QTY 6
Following the method shown in
the illustration, lay the next
layer of boards
(No’s. 24, 25, 27,
28 & 29)
onto the log cabin to
bring the board level to the top
of the window and door frames.
*Ensure that the boards are
level and flush with each other
as you lay each one.
25
27
25
28
Rubber Mallet
may be required
to fit parts.
32
29
24
31
Step 14
Parts needed - No. 24 QTY 1
No. 29 QTY 1
No. 31 QTY 1
No. 32 QTY 1
Following the method shown in
the illustration, lay the last
boards (
No’s. 24, 29, 31 & 32)
on to the log cabin.
*Ensure that the boards are
level and flush with each other
as you lay each one.
Rubber Mallet
may be required
to fit parts.
Pre drill
hole
70mm
screw
IMPORTANT:
Pre-drill before fixing screws.
22
22
Step 15
Parts needed - No. 22 QTY 2
Place the gable tops
(No. 22)
onto
the log cabin. Fix into position by
screwing through the notches as
shown in the illustration.
*Ensure that the boards are level
and flush with each other as you
lay each one.
4x70mm Screws
Rubber Mallet
may be required
to fit parts.
30
Pre drill
hole
70mm
screw
IMPORTANT:
Pre-drill before fixing screws.
30
Rubber Mallet
may be required
to fit parts.
Step 16
Parts needed - No. 30 QTY 2
Place the Finisher Boards (
No. 30
)
onto the building. Secure into
position at either end by screwing
through the notch into the board
below.
*Ensure that the boards are level
and flush with each other as you
lay each one.
4x70mm Screws