![Mercia Garden Products 0628RANE0403HGDD2SW-V1 General Instructions Manual Download Page 16](http://html1.mh-extra.com/html/mercia-garden-products/0628rane0403hgdd2sw-v1/0628rane0403hgdd2sw-v1_general-instructions-manual_1772577016.webp)
Please retain product label and instructions for future reference
P 16
Pre drill
hole
70mm
bolt
41
41
Step 31
Parts needed - No. 41 QTY 8
Arrange the storm braces (
No. 41
) around
the building (
internally
). Place 2x storm
braces per side fixing into place using 2x
70mm bolts per brace making sure the
washer & nut are tightened from the
outside of the building.
*Ensure the storm braces are secured at
the highest point possible on each side.
The storm braces will need to be altered
during the builings life as the moisture
content within te log boards changes. The
boards will expand during periods of high
moisture (winter) and shrink during peri-
ods of low moisture (summer)
**Storm braces will help your building
expand and contract properly.
***Important: Ensure each bolt is
tightened using a washer so as not to
damage the log boards.
16x70mm Bolt Sets
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.