P 6
Please retain product label and instructions for future reference
Step 5
Parts Needed - No. 11 QTY 1
No. 12 QTY 1
No. 13 QTY 1
No. 14 QTY 1
Arrange the left, right, top & bottom door
frames
(No’s. 11, 12, 13 & 14)
onto a level
surface. Secure the top and bottom frames to
the uprights using 2x80mm screw per corner,
ensuring the screws do
NOT
protrude through
the front of the door framing.
8x80mm Screws
Pre drill
hole
80mm
screw
13
14
11
12
IMPORTANT :
Pre-drill before fixing screws.
The internal lip of the door
frame should be positioned on
the inside of the building.
14
12
Step 6
Parts Needed - No. 9 QTY 1
No. 10 QTY 1
No. 17 QTY 6
The Adjustable Door Hinge
(No.17)
comes in three parts.
Fasten No. 17a into 17b as shown in the
illustration.
Place the master and secondary
doors
(No’s 9 & 10)
onto a flat surface and fix
the Adjustable door hinge
(No.17c)
to the
doors using 3x30mm screws per hinge.
Fix 3 x Adjustable Door Hinges
(No. 17a &
b)
into position onto the door frame using
4x30mm screws per hinge.
*Ensure the hinges are fitted to the exter-
nal of the door frame so the doors open
outwards from the log cabin.
Locate the doors into the hinges ensuring
there is equal spacing on each side between
the doors and door frame, and that the
doors open & close freely without restric-
tion.
It is important to fit the doors within the
frames at this stage so that you can establish
the position of the hinges. The hinges come
in three parts. Remove the doors from the
frame after fitting.
**Ensure to screw into the framing and not
into the channel.
42x30mm Screws
17a
Pre drill
hole
30mm
screw
9
10
17
a
b
17b
a
b
IMPORTANT :
Pre-drill before fixing screws.
Secondary Door
Master Door