Please retain product label and instructions for future reference
P 13
c
21
IMPORTANT :
Pre-drill before fixing screws.
15
b
a
Step 24
Parts Needed - No. 15 QTY 1
No. 21 QTY 2
Attach the Door Strip
(No. 15)
to the
back of the secondary door using
4x40mm screws as shown.
Once fixed, place the Tower
Bolts
(No. 21)
roughly into position at
the top and bottom of the door strip.
With a pencil mark the around the bolt.
After marking the bolt onto the
frame, drill a hole for the barrel bolt to
locate into.
Following the hole being drilled,
place the tower bolts into position and
secure using the screws provided.
4x40mm Screws
a
b
c
Pre drill
hole
40mm
screw
Front
Side
34
Step 25
Parts neeeded - No. 34 QTY 35
Place the first floor board (
No. 34
) inside
the building flush to the log board on
one side. Continue adding the floor
boards (
internally
) making sure to
interlock each individual board.
*Do
NOT
secure the boards until the
last board has been measured and cut.
Following the same method as before
measure the gap between the bottom
of the tongue (
on the last board placed
)
and the log board.
Using a straight edge mark out the
measurement onto the last floor board
(No. 34)
and cut along the length
removing the excess.
**Please note:
Mark the final board 2mm
under the measurement; This will allow
the timber to expand and contract
correctly.
Once all the floor boards are in position
secure each board into position using
8x40mm screws.
You have been issued with 35 floor boards,
but in reality you may only need to use 34
***Please Note:
Ensure to screw through
each of the floor boards into the floor
bearers.
280x40mm Screws
40mm
screw
Pre drill
hole
*
Cut to fit
IMPORTANT :
Pre-drill before fixing screws.
34