39
06/2021
Pumping device CPM
Pump connection IN (suction line): Attach the tube to the long pipe connec-
tion on the water bath, as this is where the water is conveyed from the water
bath to the pumping device.
Pump connection OUT (pressure line): Attach the tube to the short pipe
connection on the water bath, as this is where the water from the pump is
conveyed back to the water bath.
3.
Fit the hoses onto the pipe connections
NOTICE
Summary of Contents for CDP115
Page 61: ...61 06 2021 Attachment...
Page 62: ...62 06 2021 Attachment...
Page 63: ...63 06 2021 Attachment...