InfiniBand FDR Switch Platform Hardware User Manual
Mellanox Technologies
32
6. Unscrew both lock-down bars.
7. Place the chassis in front of the rack and as close as possible to the rack.
Figure 19: Fork Lift
Figure 20: Mechanical Lift
8. Raise the chassis so that it is ~5cm above the shelf in the rack.
9. Raise the hinged extension on the container floor.
10. Lower the chassis until the hinged extension is sitting on the shelf extension.
11. Push the chassis from the container to the shelf.
With both lock-down bars removed the chassis can roll! Be very careful that the chassis
does not roll off of the pallet.
Save the container pallet to remove this chassis. It will be necessary for the removal
and disposal procedures.
Container floor
Hinged extension