InfiniBand FDR Switch Platform Hardware User Manual
Mellanox Technologies
28
12. Place 8 caged nuts into the vertical rack support at the locations corresponding to the
holes in the chassis faceplate. The holes in the faceplate start at 2U above the shelf
and are spaced every 4U centered as you go up the vertical rack support. There are 4
holes on each side.
1.7.3.6 Inserting the Chassis
1. Put the container on the fork lift.
Figure 13: Putting the Chassis in the Rack Using a Fork Lift
The chassis is on ball bearings and can roll easily. Be aware that the chassis can roll off
of the pallet.
Should the chassis start to fall, move out of the way.
The chassis can
cause grave bodily harm should it fall on or near you.
The chassis is screwed down to the pallet on both the spine side and the leaf side.