9750359
54 / 62
Maintenance work
Visual inspection
U= M
-iClea
n U
H=M
-i
Clean
H
Chec
ked
Clean
ed
Repla
ced
Maintenance
requirement
7. Wastewater installation
Replace flap on ventilation valve
U/H
annually
Check operation of drain pump during drainage
U/H
annually
Check pumps, hoses and wastewater heat exchangers (optional
extra) are not leaking
U/H
annually
8. Detergent dosing
Replace peristaltic hose and seals on the nozzles
U/H
annually
Check detergent dosing system is working and not leaking
U/H
annually
9. Rinse aid dosing
Replace peristaltic hose and seals on the nozzles
U/H
annually
Check rinse aid dosing system is working and not leaking
U/H
annually
10.Test run including functional test of whole machine
Check filling and heating until it is ready for operation
U/H
annually
Visual inspection of the entire machine for leaks
U/H
annually
Check results of test wash and rinse
U/H
annually
11.
Options
Integrated reverse osmosis system (if applicable)
Visually check whole system for leaks
U/H
annually
Change pre-filter (standard membrane (<0.1 mg/l))
U/H
every 6 months
Change pre-filter (chlorine-resistant
membrane (≥ 0.1 and ≤ 2.0 mg/l))
U/H
every 3 months
Check fine sieve insert and choke in concentrate pipeline
U/H
annually
Check correct function of concentrate drain and check for deposits
U/H
annually
Fill in separate log, "Certificate of Commissioning, GiO"
U/H
annually
Partial demineralisation (PD)/Full demineralisation (FD) (if applicable)
Functional test
U/H
annually
Heat retention system (if applicable)
Visually check lever arm
H
annually
Check sheeting for damage
H
annually
Functional test
H
annually
Exhaust air heat recovery (if applicable)
Functional test of fan
U/H
annually
Functional test of solenoid valve
U/H
annually
Carry out visual inspection and leak test
U/H
annually
12.
Water quality, temperature
Drinking water
°C
°dH
°CH
µS/cm
U/H
annually
Water quality after water
treatment (if applicable)
°C
°dH
µS/cm
U/H
annually
13.
Electrical safety check (certificate is optional)
Carry out the visual inspection
U/H
annually
Check the protective earth conductor
U/H
annually
Insulation resistance measurement
U/H
annually
Measure current on protective earth conductor
U/H
annually
Summary of Contents for M-iClean H series
Page 61: ...61 62 9750359 13 Notes...