Me2, Fog Generator
Operating Guide, Rev: A/a
8 / 30
Installing the Me2
Exercise caution when selecting the location to install or use this equipment:
Install the MDG
Me2
away from rain, wind, heavy dust or any harsh environment
situations.
Ensure available space for all electrical cable and gas tubing runs,
The MDG
Me2
requires 2 m (6.56 ft) of clearance to the front.
Fill the reservoir with
MDG Neutral Fog Fluid
(see
Filling the Fluid Reservoir
paragraph).
Connect the gas inlet to a gas bottle equipped with a single or double stage regulator. The gas
inlet is an Oxygen Adaptor (9/16-18 R.H).
Connect the data wiring (Male XLR-5 connector for DMX/RDM) if you are using a DMX or RDM
controller.
Connect the power cord 100-250 VAC, 50-60 Hz, 1415W.
Open the gas bottle, and set the pressure between 50 and 60 psi (3.5 and 4.1 bar, or 350 and
410 kPa).
Summary of Contents for ME2
Page 2: ...Me2 Fog Generator Operating Guide Rev A a 2 30 Intentionally left blank...
Page 26: ...Me2 Fog Generator Operating Guide Rev A a 26 30 Dimensions...
Page 27: ...Me2 Fog Generator Operating Guide Rev A a 27 30...
Page 29: ...Me2 Fog Generator Operating Guide Rev A a 29 30 Declaration of conformity...
Page 30: ...Me2 Fog Generator Operating Guide Rev A a 30 30 Notes...