8-1
8
nanoSwitch Installation Guide
External Line Commissioning
External Line Commissioning
Before the external lines are commissioned, all of the extensions should be tested and the
nanoSwitch programmed with the customers requirements.
Line Status
The line status can be shown on the front LCD or via the USB port to a PC.
Line Testing
There is no special commissioning mode for the external lines. The system needs to be running
normally and the external equipment tested.
Summary of Contents for nanoSwitch
Page 1: ...mcl nanoSwitch Installation Guide...
Page 4: ......
Page 5: ...1 General Information...
Page 6: ......
Page 8: ...1 1 2 General Information nanoSwitch Installation Guide...
Page 9: ...2 System Components...
Page 10: ......
Page 14: ......
Page 15: ...3 Site Preparation...
Page 16: ......
Page 18: ......
Page 19: ...4 System Installation...
Page 20: ......
Page 23: ...5 System Wiring...
Page 24: ......
Page 27: ...6 Front Control Panel...
Page 28: ......
Page 30: ......
Page 31: ...7 Extension Commissioning...
Page 32: ......
Page 37: ...8 External Line Commissioning...
Page 38: ......
Page 42: ......
Page 43: ...Default Configuration A...
Page 44: ......
Page 46: ......
Page 47: ...B Standard Commissioning Report Sheets...
Page 48: ......