Extension Commissioning
nanoSwitch Installation Guide
7-3
7
nanoSwitch Installation Guide
Extension Commissioning
The commissioning mode schedule on the pages 7-4 needs to be carried out from each
extension.
When all of the extensions have been tested and the commissioning mode has been deactivated,
the following engineering codes are available. The codes are accessed by entering the following
sequence
# Distributor ID & Passcode *6
.
603
- print the commissioning report
604
- remove commissioning mode from system -
Use with care
605
- Clear the commissioning report. (This is useful before entering the commisioning mode
for the first time)
Summary of Contents for nanoSwitch
Page 1: ...mcl nanoSwitch Installation Guide...
Page 4: ......
Page 5: ...1 General Information...
Page 6: ......
Page 8: ...1 1 2 General Information nanoSwitch Installation Guide...
Page 9: ...2 System Components...
Page 10: ......
Page 14: ......
Page 15: ...3 Site Preparation...
Page 16: ......
Page 18: ......
Page 19: ...4 System Installation...
Page 20: ......
Page 23: ...5 System Wiring...
Page 24: ......
Page 27: ...6 Front Control Panel...
Page 28: ......
Page 30: ......
Page 31: ...7 Extension Commissioning...
Page 32: ......
Page 37: ...8 External Line Commissioning...
Page 38: ......
Page 42: ......
Page 43: ...Default Configuration A...
Page 44: ......
Page 46: ......
Page 47: ...B Standard Commissioning Report Sheets...
Page 48: ......