nanoSwitch Installation Guide 

Extension Commissioning

Extension Commissioning

The  extensions  should  be  tested  before  the  nanoSwitch  is  programmed  with  the  customers 

requirements. If the exchange has been supplied with a customer program, then this must be used 

instead of the factory configuration tables, when checking the extension numbers and access 

rights.

Ship’s Wiring

Before power is connected to the nanoSwitch,

All short circuits must be found and removed.

Only a Digital Multimeter (DMM) to be used for line testing

The resistance reading between the two wires of the extension should be between 17KΩ and 

30KΩ. The resistance reading between either of the wires and the ship should be greater than 

500KΩ.

Line Status

Once all of the wiring has been tested, power can be applied to the nanoSwitch. 
The line status can be shown on the front LCD or via the USB port to a PC. 

Line Testing

The inital test requires all the telephones to be on-hook.
There is two methods of testing an extension. The first method for testing extensions when the 

system has been commissioned and an extension is not working. The second method is to be used 

when commissioning the whole system.

Extension Test

The extension test is for use when the system has been comissioned and an extension stops 

working  or  a  new  extension  is  added.  These  tests  do  not  require  any  special  mode  on  the 

exchange, however the extension needs the right to use the engineering functions.

Commissioning Mode

The commissioning mode is designed to help configure a new system, when there might be 

wiring errors and it is not known if all the extensions have been installed. If a printer is attached, 

then a report can be generated as each extension is tested if required.
The tests will confirm that the extension is working and has been allocated the correct class of 

service. All of the prompts are in English. Only one person is required for the tests, however up 

to five technicians can test telephones simultaneously.
The commissioning mode is activated by entering the one of the following two codes into any 

telephone:

# Distributor ID & Passcode *6 601 

- commisioning mode without printing

# Distributor ID & Passcode *6 602 

- commisioning mode with status printout

The commissioning mode is deactivated, by selecting option 5 from the commissioning menu.

Summary of Contents for nanoSwitch

Page 1: ...mcl nanoSwitch Installation Guide...

Page 2: ...pproval status of the system and void any remaining warranty There are no serviceable components in the exchange Board replacement is the only method of service Faulty boards to be returned to Marine...

Page 3: ...al Information System Components Site Preparation System Installation System Wiring Control Panel Extension Commissioning External Line Commissioning Default Configuration 7 8 A Standard Commissioning...

Page 4: ......

Page 5: ...1 General Information...

Page 6: ......

Page 7: ...ithin the exchange can be changed to suit individual requirements using a Windows computer Programming is via USB on the processor board or via a network connection Configuration and log files can als...

Page 8: ...1 1 2 General Information nanoSwitch Installation Guide...

Page 9: ...2 System Components...

Page 10: ......

Page 11: ...front panel has the 2 power switches an LCD display and cursor buttons for navigating the menu system Power Supply Unit C4080 The power supply is made up of 2 parts The AC 90 264V 50 60Hz is converted...

Page 12: ...high quality voice reproduction Voice Prompting is normally in English but can be updated by the user to any language or message On the card there are connectors for an USB connection to a PC or lapto...

Page 13: ...ule AG2120 COIC Module The AG2120 module provides PABX Loop Start lines with circuitry for ring and loop current detection A D and D A conversions and pulse and flash signalling M10 Public Address Mod...

Page 14: ......

Page 15: ...3 Site Preparation...

Page 16: ......

Page 17: ...ted in the integral Main Distribution Frame MDF or to an external unit located within 3 metres of the telephone exchange Check on site Equipment Once the equipment installation location has been ident...

Page 18: ......

Page 19: ...4 System Installation...

Page 20: ......

Page 21: ...mm deep The unit must be placed on runners and sliders to allow easy access and to support the unit along the full depth The unit will need access to the top so that services can be carried out Power...

Page 22: ...4 2 4 System Installation nanoSwitch Installation Guide 436 85 6 482 AC DC ETH RS232 37 44 10 18 19 18 37 420 15 18 465 436 420 368 31 4 Top View Side View Rear End View...

Page 23: ...5 System Wiring...

Page 24: ......

Page 25: ...e wiring for the port is the same as on a Personal Computer The manual for the printer will give the required wiring and connections The serial printer is set up as 9600baud 8 bits and 1 stop bit and...

Page 26: ...Ext No P7 1 2 25 124 P7 3 4 26 125 P7 5 6 27 126 P7 7 8 28 127 P8 1 2 29 128 P8 3 4 30 129 P8 5 6 31 130 P8 7 8 32 131 P9 1 2 33 132 P9 3 4 34 133 P9 5 6 35 134 P9 7 8 36 135 P10 1 2 37 136 P10 3 4 3...

Page 27: ...6 Front Control Panel...

Page 28: ......

Page 29: ...6 5 6 nanoSwitch Installation Guide Front Control Panel Front Control Panel The functionality of the front panel is being developed More details will available with updates to the system firmware...

Page 30: ......

Page 31: ...7 Extension Commissioning...

Page 32: ......

Page 33: ...has been commissioned and an extension is not working The second method is to be used when commissioning the whole system Extension Test The extension test is for use when the system has been comissi...

Page 34: ...een tested and the commissioning mode has been deactivated the following engineering codes are available The codes are accessed by entering the following sequence Distributor ID Passcode 6 603 print t...

Page 35: ...ard Telephone is old LD or Pulse replace with modern DTMF telephone Faulty telephone check with know working telephone 3 Dial 6 New tone heard 4 Replace handset Telephone starts ringing Line status sh...

Page 36: ...the number 3 Check Standard Rights Dial 2 The default user ID and corrected ID if entered is reported If the ID is correct press 1 If the ID is wrong but the correct ID is not known press 2 If the ID...

Page 37: ...8 External Line Commissioning...

Page 38: ......

Page 39: ...all of the extensions should be tested and the nanoSwitch programmed with the customers requirements Line Status The line status can be shown on the front LCD or via the USB port to a PC Line Testing...

Page 40: ...problems further fault finding with mcl is required 3 Replace handset Line status shows as in active The external equipment detects dropped line AG2120 COIC Module Test Incoming Test Action Response P...

Page 41: ...ystem works as expected If there are problems further fault finding with mcl required 3 Replace handset Line status shows as in active The external equipment detects dropped line M90 Signal Relay Modu...

Page 42: ......

Page 43: ...Default Configuration A...

Page 44: ......

Page 45: ...Port Ext Class Tie Access PA Access Transfer Interrupt 2 9 132 Crew 2 10 133 Crew 2 11 134 Crew 2 12 135 Crew 2 13 136 Crew 2 14 137 Crew 2 15 138 Crew 2 16 139 Crew 3 1 140 Crew 3 2 141 Crew 3 3 142...

Page 46: ......

Page 47: ...B Standard Commissioning Report Sheets...

Page 48: ......

Page 49: ...10 1 12 111 1 13 112 1 14 113 1 15 114 1 16 115 2 1 116 2 2 117 2 3 118 2 4 119 2 5 120 2 6 121 2 7 122 2 8 123 2 9 124 2 10 125 2 11 126 2 12 127 2 13 128 2 14 129 2 15 130 2 16 131 Commissioning Rep...

Page 50: ...witch Installation Guide Board Port Ext Ship Location Correct Exchange Position Correct Ext Ring OK DTMF OK Notes 3 1 132 3 2 133 3 3 134 3 4 135 3 5 136 3 6 137 3 7 138 3 8 139 3 9 140 3 10 141 3 11...

Page 51: ...B 3 B nanoSwitch Installation Guide Standard Commissioning Report Sheets Board Port Ext Ship Location Correct Exchange Position Correct Ext Ring OK DTMF OK Notes...

Page 52: ...B 4 B Standard Commissioning Report Sheets nanoSwitch Installation Guide Board Port Ext Ship Location Correct Exchange Position Correct Ext Ring OK DTMF OK Notes...

Reviews: