
ChipMaster Conveyor
Operation & Maintenance Manual
14
Rev. 05-2021
Note:
On a sectional belt, all mating sections are clearly identified, and the leading section has a
special pan with a welded hook attachment
For belt supplied in sections, assemble as shown in Fig. 2
o
Locate the mating ends of each belt section.
o
Remove the cotter pins from the axle and pull the axle from the pan.
o
Mate the tabs on the end pans, the side wings, and draw bars. Replace the axle and
cotter pins. Bend up both legs of the cotter pins to secure the axle.
o
Repeat these steps for each belt section.
Fig. 2
To assist in the installation of the belt, it is recommended that you temporarily remove the
drive shaft as follows. See fig. 3
Fig. 3
No. Description
1
Draw Bar
2
Roller
3
Side Wings
4
Pan
5
Axle
6
Cotter Pins
No. Description
1
Chain Guard
2
Drive Chain
3
Motor Drive Sprocket
4
Torque Limiter Assembly
5
Keys
6
Drive Shaft
7
Backplate
8
Belt Drive Sprockets
9
Conveyor Belt (Note: insert upside down
Summary of Contents for ChipMaster
Page 1: ...ChipMaster Operation Maintenance Manual ...
Page 35: ...ChipMaster Conveyor Operation Maintenance Manual 35 Rev 05 2021 Notes ...
Page 41: ...Mat Nr 605 06 99 46 05 www nord com ...
Page 43: ...BIM 1004 2005 05 Page 2 of 20 www nord com NOTES ...
Page 62: ... NOTES ...
Page 63: ... NOTES ...