9
The gates must be properly installed and work freely in both directions prior to the installation of the dual gate operators.
See “Gate Operator Position” on page 6 for operator positions
.
Each entrapment protection device MUST be connected to corresponding gate operator.
Outside Property
Inside Property
to Secondary Operator
to Secondar
y Operator
to Primary Operator
to Primar
y Operator
POWER
IN
POWER/SOLAR
IN
BA
TTER
Y
IN
www
.max.us.com
Made in USA
BA
TTER
Y
P
ACK
TO MOTOR
CONTROLLER
AC
ON
POWER
OFF
MAX PS-24
POWER SUPPLY
FUSE
7 AMP
IN
Made in USA
Power
INPUTS
MC-100
JOG
RIGHT
JOG
LEFT
UL
Entrap
Matrix
On Line
ERD
Sensitivity
Photo
Cell
Limit SW
On Line
Edge 2
Edge 1
Edge 1
Edge 2
Photo Cell
GND
Jog R
T
Jog L
T
MOTOR OVERLOAD
Motor Controller
ERD
Min
Max
POWER
IN
POWER/SOLAR
IN
BA
TTER
Y
IN
www
.max.us.com
Made in USA
BA
TTER
Y
P
ACK
TO MOTOR
CONTROLLER
AC
ON
POWER
OFF
MAX PS-24
POWER SUPPLY
FUSE
7 AMP
IN
Made in USA
Power
INPUTS
MC-100
JOG
RIGHT
JOG
LEFT
UL
Entrap
Matrix
On Line
ERD
Sensitivity
Photo
Cell
Limit SW
On Line
Edge 2
Edge 1
Edge 1
Edge 2
Photo Cell
GND
Jog R
T
Jog L
T
MOTOR OVERLOAD
Motor Controller
ERD
Min
Max
Illustrations not to scale
installation
Photocell
(
OPENING
Cycle
ONLY
)
Photocell
(
OPENING
Cycle
ONLY
)
Sensing Edges
Entrapment Area
Entrapment Area
Control Box
RS-485/Optional Key Switch to Control Box
Input
Power
Input
Power
Conduit
•
REQUIRED -
Run AC input power wire to
EACH
gate operator.
•
REQUIRED -
Run 24VDC/RS-485/Optional Key Switch wires from
PRIMARY
operator to the
CONTROL BOX
.
•
REQUIRED -
Run RS-485/Optional Key Switch wires from
SECONDARY
operator to the
CONTROL BOX
.
•
Run UL 325 entrapment protection device conduits to
EACH
Corresponding
GATE OPERATOR
. (see below & page 14)
•
Run the
CLOSING
cycle protection device conduit (photocells) to the
CONTROL BOX
. (page 14)
•
Run in-ground loop wires to the
CONTROL BOX
. (page 15)
dual Gate Operators
24VDC/RS-485/
Key Switch
Primary
Primary
Secondary
Secondary
“Optional” Input Power Note:
24VDC low voltage power wires can be run from a remote
power supply (MAX Magic Boxes) to power the gate
operators if desired. See page 11 for more information.
19”
Support Bars:
See bottom of page 8.
Arms MUST be installed level.
Conduit Guidelines and Suggestions
Illustration not to scale
Check local building codes in your area for
depth of concrete before installation.
Secure EACH gate
operator to concrete
pad with four (4)
1/2” x 3” (min)
sleeve anchors.
Concrete Depth Note:
The heavier the gates, the deeper the concrete
pads should be. At least
two feet
recommended for heavier gates.
1/2
6” Above
Ground