8
Control Box
Concrete Pad
24VDC/RS-485/
Key Switch
Input Power
Conduit
Check local building
codes in your area for
depth of concrete
before installation.
6” Above Ground
Ground Level
Secure gate operator
to concrete pad with
four (4) 1/2” x 3”
(min) sleeve anchors.
19”
Arm MUST be installed level.
Concrete Depth Note:
The heavier the gate, the deeper the concrete
pad should be. At least
two feet
recommended for heavier gate.
installation
single Gate Operator
•
REQUIRED -
AC input power wire to the
GATE OPERATOR
.
•
REQUIRED -
24VDC/RS-485/Optional Key Switch wires from
CONTROL BOX
to
GATE OPERATOR
.
•
OPENING
cycle protection device wires (photocells) to the
GATE OPERATOR
. See page 14.
•
CLOSING
cycle protection device wires (photocells) to the
CONTROL BOX
. See page 14.
•
In-ground loop wires to the
CONTROL BOX
. See page 15.
Conduit Guidelines and Suggestions
(See page 7)
1/2
“Optional” Input Power Note:
24VDC low voltage power wires can be run
from a remote power supply (MAX Magic
Box) to power the gate operator if desired.
See page 11 for more information.
Support Bar:
See below
Illustration not to scale
The gate must be properly installed and work freely in both directions prior to the installation of the gate operator.
See “Gate Operator Position” on page 6 for operator position
.
Support Bar
A support bar should be installed at the gate bracket height across the
ENTIRE
gate to keep the gate pickets from bending.
YES
YES
NO
NO
Gate Bracket
Support Bar Too High & Not Long Enough
Support Bar
19”