VR2250
Page 109 of 131
EXAMPLE OF INSULATION MEASUREMENT ON AN INSTALLATION
OPEN
OPEN
OPEN
OPEN
OPEN
Insulation measurements on an installation.
A procedure indicating how to perform the insulation resistance measurement on an
installation is reported in the following table:
Switch A
Switch B
Switch C
Switch E
near the
washing
machine with
the purpose
of
separating
this from the
installation.
FM socket
Panel meter
Switch D near
the boiler with the
purpose of
separating this
from the
installation.
MARVR2250
MARVR2250