![background image](http://html1.mh-extra.com/html/mars/ph10-unheated-series/ph10-unheated-series_installation-operation-and-maintenance-manual_1730599021.webp)
15831-8
A.
Install air curtains in accordance with approved shop drawings and manufacturer's
printed installation instructions.
B.
Install air curtains plumb, level, square, true to line, and weathertight, without warp
or rack.
C.
Anchor air curtains securely in place to supports.
D.
Install sheet metal flashing as specified in Section 07620.
E.
Install joint sealants as specified in Section 07920.
F.
Install electrical power as specified in Section 16100.
G.
Install door limit switches and adjust for correct operation.
H.
Provide connection to piped services and utilities as specified in Sections of
Divisions 15.
3.3
FIELD QUALITY CONTROL
A.
Adjust air curtains to function properly.
B.
Adjust air foil vanes located within the discharge nozzle as required for prevailing
conditions at each opening.
C.
Check heated air curtain performance on a calm day by measuring air temperature 6
inches off the floor. Optimal reading is halfway between the temperature inside and
outside the building.
3.4 CLEANING
A.
Clean air curtains promptly after installation in accordance with manufacturer's
instructions.
B.
Repair minor damages to finish in accordance with manufacturer's instructions and
as approved by Architect.
C.
Remove and replace damaged components that cannot be successfully repaired as
determined by Architect.
3.5 PROTECTION
A.
Protect materials and finish from damage until substantial completion.
3.6 SCHEDULE
A.
Refer to Air Curtain Schedule appended to this section.
END OF SECTION