background image

P:

 0800 357 1233 

E: 

[email protected]  

W: 

www.centralheating.co.nz

Radiatori 2000 Plus

Assembly Guide

Before Assembly

ASSEMBLY PREPARATION

Place all parts on a flat surface.

Ensure all machined faces and internal threads are clean.

PARTS REQUIRED

There are two joints to be made for each pair of sections. Each 
requires one connection nipple and one gasket. A nipple key and 
tommy bar are required to rotate and tighten the connections.

CONNECTIONS

Each section has right-handed connections at one end and left-handed 
ones at the other. Nipples have one end left handed and one right 
handed. Determine the orientation of connections before assembly.

Assembly

ATTACHING THE NIPPLES TO THE FIRST SECTION

Screw a pair of nipples into one end of the radiator.

Only screw in by one turn, do not screw in fully.

Place a gasket approximately at the mid-point of each nipple.

Do not use any jointing paste or tape (PTFE or similar) to the 
gasket, nipple threads or radiator.

Reviews: