© Welbilt, Inc.
Ice Thickness Probe Operation (ITP)
84
Indigo NXT QuietQube/CVD: Sequence of Operation
• The Ice Thickness Probe (ITP)
senses ice on the evaporator
and signals the control board
to start a harvest cycle.
• At the start of every freeze
cycle the Ice Machine is
locked into a 6 Minute Freeze
cycle
• The 6 Minute Lock in can be
overridden only by the
manual harvest through the
interface display.
• When the ITP comes in
contact with the ice and after
the 6 minute Lock in, the ice
machine will go into harvest.
1/8” Bridge
thickness of ice
Summary of Contents for Welbilt Indigo NXT QuietQube
Page 3: ... Welbilt Inc Welbilt Inc Engineered For Ease Overview INDIGO NXT 3 ...
Page 17: ... Welbilt Inc Welbilt Inc Engineered For Ease QuietQube CVD Installation INDIGO NXT 17 ...
Page 50: ... Welbilt Inc Engineered For Ease Menu Navigation Indigo NXT Ice Machines ...
Page 54: ... Welbilt Inc Indigo NXT Menu Navigation Alert 54 Touch Screen Interface Main Menu ...
Page 55: ... Welbilt Inc Indigo NXT Menu Navigation Alert 55 Touch Screen Interface Main Menu ...
Page 114: ... Welbilt Inc Welbilt Inc Engineered For Ease Troubleshooting INDIGO NXT Ice Machine 114 ...
Page 126: ... Welbilt Inc Welbilt Inc Engineered For Ease Troubleshooting Tips INDIGO NXT Ice Machine 126 ...
Page 153: ... Welbilt Inc Water Level Probe Diagnostics 153 Indigo NXT Ice Machine Troubleshooting Tips ...