© Welbilt, Inc.
Ice Thickness Probe Diagnostics
140
Indigo NXT Ice Machine Troubleshooting Tips
Should be adjusted to maintain 1/8” ice bridge
thickness
In order to achieve proper bridge thickness the
gap
between the flat part of the ITP and the
grid should be set to
9/32” (7mm) with no
ice on it as shown
.
Adjustment
Screw
Cube Cells
Probe Gap
9/32”
1/8” Bridge”
Microphone
Function:
The ice thickness probe sense ice on the
evaporator and signals the control board to start a
harvest cycle.
NOTE: The Ice Machine incorporates a 6 minute freeze
lock-in feature to prevent the ice machine from short
cycling in and out of harvest.
Summary of Contents for Welbilt Indigo NXT QuietQube
Page 3: ... Welbilt Inc Welbilt Inc Engineered For Ease Overview INDIGO NXT 3 ...
Page 17: ... Welbilt Inc Welbilt Inc Engineered For Ease QuietQube CVD Installation INDIGO NXT 17 ...
Page 50: ... Welbilt Inc Engineered For Ease Menu Navigation Indigo NXT Ice Machines ...
Page 54: ... Welbilt Inc Indigo NXT Menu Navigation Alert 54 Touch Screen Interface Main Menu ...
Page 55: ... Welbilt Inc Indigo NXT Menu Navigation Alert 55 Touch Screen Interface Main Menu ...
Page 114: ... Welbilt Inc Welbilt Inc Engineered For Ease Troubleshooting INDIGO NXT Ice Machine 114 ...
Page 126: ... Welbilt Inc Welbilt Inc Engineered For Ease Troubleshooting Tips INDIGO NXT Ice Machine 126 ...
Page 153: ... Welbilt Inc Water Level Probe Diagnostics 153 Indigo NXT Ice Machine Troubleshooting Tips ...