Part Number Preliminary 6/11
307
Charts
Cycle Times/24-Hour Ice Production/
Refrigerant Pressure Charts
These charts are used as guidelines to verify correct
ice machine operation.
Accurate collection of data is essential to obtain the
correct diagnosis.
•
Production and cycle times are for dice cube - Half
dice cube cycle times can be 2 - 3 minutes faster,
depending on model and ambient temperature.
•
Regular cube production derate is 7%.
•
Ice production checks that are within 10% of the
chart are considered normal. This is due to
variances in water and air temperature. Actual
temperatures will seldom match the chart exactly.
•
Refer to “Symptom #2 - Operational Analysis
Table” page 144 for the list of data that must be
collected for refrigeration diagnostics. This list
includes: before beginning service, ice production
check, installation/visual inspection, water system
checklist, ice formation pattern, safety limits,
comparing evaporator inlet/outlet temperatures,
discharge and suction pressure analysis.
•
Zero out manifold gauge set before obtaining
pressure readings to avoid misdiagnosis.
•
Discharge and suction pressure are highest at the
beginning of the cycle. Suction pressure will drop
throughout the cycle. Verify the pressures are
within the range indicated.
•
Record beginning of freeze cycle suction pressure
one minute after water pump energizes.
•
50Hz dice and half dice production derate is 12%.
•
50Hz regular cube total production derate is 14%.
Summary of Contents for ICVD3095
Page 2: ......
Page 12: ...12 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Page 25: ...Part Number Preliminary 6 11 25 This Page Intentionally Left Blank ...
Page 26: ...26 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Page 36: ...36 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Page 72: ...72 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Page 101: ...Part Number Preliminary 6 11 101 This Page Intentionally Left Blank ...
Page 132: ...132 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Page 137: ...Part Number Preliminary 6 11 137 This Page Intentionally Left Blank ...
Page 138: ...138 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Page 187: ...Part Number Preliminary 6 11 187 This Page Intentionally Left Blank ...
Page 188: ...188 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Page 225: ...Part Number Preliminary 6 11 225 This Page Intentionally Left Blank ...
Page 226: ...226 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Page 262: ...262 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Page 283: ...Part Number Preliminary 6 11 283 ACCESS REMOTE RECOVERY EVACUATION CONNECTIONS ...
Page 291: ...Part Number Preliminary 6 11 291 This Page Intentionally Left Blank ...
Page 298: ...298 Part Number Preliminary 6 11 USING PINCH OFF TOOL ...
Page 303: ...Part Number Preliminary 6 11 303 This Page Intentionally Left Blank ...
Page 304: ...304 Part Number Preliminary 6 11 ...
Page 305: ...Part Number Preliminary 6 11 305 This Page Intentionally Left Blank ...
Page 306: ...306 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Page 337: ...Part Number Preliminary 6 11 337 I0500 Remote Air cooled 1Ph ...
Page 339: ...Part Number Preliminary 6 11 339 I0600 I0850 I1000 Remote Condenser Air cooled 1 3 Ph ...
Page 341: ...Part Number Preliminary 6 11 341 IB0690C IB0890C IB1090C QuietQube Remote Air cooled 1 3 Ph ...
Page 342: ...342 Part Number Preliminary 6 11 I1400 I1800 Self Contained Air Water cooled 1 3 Ph ...
Page 343: ...Part Number Preliminary 6 11 343 I1400 I1800 Remote Air cooled 1 3 Ph ...
Page 349: ......