3 - 6
SERVICING SCHEDULE
A
FTER THE FIRST
50
WORKING HOURS SERVICE
D1 - Drain and change the engine oil.
D2 - Change the engine oil filter.
D4 - Change the fuel filter cartridge.
D5 - Change the hydraulic return oil filter cartridge.
D6 - Change the oil tank breather.
E3 - Change the hydrostatic transmission oil filter cartridge.
E4 - Drain and change the transfer box oil.
E5 - Drain and change the oil of the front axle differential.
E6 - Drain and change the oil of the front wheel reducers.
A - E
VERY DAY OR EVERY
10
WORKING HOURS SERVICE
A1 - Check the engine oil level.
A2 - Check the cooling liquid level.
A3 - Check the fuel level.
A4 - Drain the fuel pre-filter.
A5 - Check the tyre pressure and the wheel nut torque.
B - E
VERY
50
WORKING HOURS SERVICE
B1 - Clean the dry air filter cartridge.
(In heavily dust laden atmosphere, reduce this servicing schedule)
B2 - Check the hydraulic oil level.
B3 - Check the braking oil level.
B4 - Check the level of the windscreen washer liquid.
B5 - Check the battery electrolyte level.
B6 - Clean the radiator core.
B7 - Check and adjust the tension and alignment of the mast lifting chains.
B8 - Lubricate the mast guide rollers.
B9 - Mast greasing.
B10 - General greasing.
C - E
VERY
200
WORKING HOURS SERVICE
C1 - Check and adjust the parking brake.
C2 - Check and adjust the tension of the belt Alternator / Fan / Crankshaft.
C3 - Check the level of the transfer box oil.
C4 - Check the level of the front axle differential oil.
C5 - Check the level of the front wheel reducer oil.
C6 - Clean and lubricate the mast uprights.
(Before starting up the new lift truck and a last time after 200 workind hours service)
C7 - Drain the fuel filter.
3 - 20
3 - 20
3 - 21
3 - 22
3 - 22
3 - 24
3 - 25
3 - 26
3 - 26
3 - 10
3 - 10
3 - 11
3 - 11
3 - 11
3 - 12
3 - 13
3 - 13
3 - 14
3 - 14
3 - 14
3 - 15
3 - 15
3 - 16
3 - 16
3 - 18
3 - 18
3 - 18
3 - 19
3 - 19
3 - 19
3 - 19
Summary of Contents for MSI 40
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...1 1 1 OPERATING AND SAFETY INSTRUCTIONS 1 OPERATING AND SAFETY INSTRUCTIONS...
Page 8: ...1 2...
Page 11: ...1 5...
Page 23: ...1 17...
Page 28: ...1 22...
Page 29: ...2 1 2 DESCRIPTION 2 DESCRIPTION...
Page 30: ...2 2...
Page 31: ...2 3...
Page 45: ...2 17...
Page 46: ...2 18 DIMENSIONS AND LOAD CHART MSI 40 MSI 50...
Page 71: ...3 1 3 MAINTENANCE 3 MAINTENANCE...
Page 72: ...3 2...
Page 79: ...3 9...
Page 110: ...4 2...