E 300 Operator Interface
M&R Printing Equipment, Inc. - Glen Ellyn, Illinois
52
The adjustment has a range of between “0.01” sec-
ond and “2” seconds delay time. To adjust the
“Front Delay” time, enter the desired time interval
using the numerical keys, then press the “ENTER”
key one time. Your selection is now saved in the
Press the “RIGHT ARROW” key one time to access
the “Front Duration” dwell time. This sub-menu
item permits the adjustment of the time duration in
which the front air valve which operates the front
spray gun is activated. This adjustment, like the
“Front Delay” adjustment described above, permits
the system Operator to precisely set the two front
spray guns to synchronize with the current index
speed. The adjustment has a range of “0.00” sec-
onds to “2” seconds. Use the numerical keys to
enter the desired time value, then press the
“ENTER” key one time. Your selection is now saved
in the PLC memory. (See Figure 12 above)
The next sub-menu item is “Rear Delay”. This sub-
menu item permits the system Operator to program
a start delay time for the one rear air valve which
operates the rear spray gun. As with “Front Delay”
described previously, this adjustment is provided to
precisely set the spray gun trigger cycle to the speed
of the indexer when operating the press in the auto-
matic mode. The adjustment has a range of “0.01”
second to “2” seconds delay time.
To adjust the “Rear Delay” time, press the “RIGHT
ARROW” key so that the flashing cursor is located
under the current indication. Now using the numeri-
cal keys, enter the desired delay time, then press the
“ENTER” key. Your selection is now saved in the
PLC memory. (See Figure 12 above)
The next sub-menu item is “Rear Duration”. This
sub-menu item permits the adjustment of the time
duration in which the rear air valve which operates
the rear spray gun is activated. This adjustment, like
the “Rear Delay” adjustment described previously,
permits the system Operator to precisely set the one
rear spray gun to synchronize with the current index
speed.
Figure 12
GLUE APPLICATOR
Spray 1 Revltn Only:
Off
Spray Every:
0 Revolution
Front Delay: 0.01 [s]
Duration: 0.00 [s]
Rear Delay: 0.01 [s]
Duration: 0.00 [s]
Revolution #: 0
Pallet #: 0
TIMERS
nozzle
TESTS
MPR
Pg Dwn
Pg Up
Summary of Contents for 12 COLOR
Page 4: ......
Page 6: ......
Page 8: ......
Page 18: ...M R Printing Equipment Inc Glen Ellyn Illinois 10 Specifications NOTES...
Page 38: ...Quartz Flash Operation M R Printing Equipment Inc Glen Ellyn Illinois NOTES 30...
Page 72: ...081200MS PREVENTIVE MAINTENANCE PROCEDURE CHALLENGER Series II NOTES 64...
Page 84: ...PREVENTIVE MAINTENANCE PROCEDURE CHALLENGER Series II NOTES 081200MS 76...
Page 88: ...081200MS PREVENTIVE MAINTENANCE PROCEDURE CHALLENGER Series II NOTES 80...
Page 104: ...PREVENTIVE MAINTENANCE PROCEDURE CHALLENGER Series II NOTES 96...
Page 112: ...PREVENTIVE MAINTENANCE PROCEDURE CHALLENGER Series II NOTES 104...
Page 114: ...081200MS PREVENTIVE MAINTENANCE PROCEDURE CHALLENGER Series II NOTES 106...
Page 116: ...PREVENTIVE MAINTENANCE PROCEDURE CHALLENGER Series II NOTES 108...
Page 118: ...081200MS 110 This page left blank intentionally...
Page 122: ...Leveling the Pallets M R Printing Equipment Inc Glen Ellyn Illinois 114 NOTES...
Page 128: ...Idec Relay Identification NOTES 120...
Page 144: ...Trouble Shooting Procedure NOTES 136...
Page 153: ......
Page 154: ......
Page 156: ......
Page 160: ......
Page 162: ......
Page 164: ......
Page 166: ......
Page 168: ......
Page 172: ......
Page 174: ......
Page 176: ......
Page 178: ......
Page 180: ......
Page 182: ......
Page 184: ......
Page 186: ......
Page 188: ......
Page 190: ......
Page 192: ......
Page 194: ......
Page 196: ......
Page 198: ......
Page 200: ......
Page 202: ......
Page 204: ......
Page 206: ......
Page 208: ......
Page 210: ......
Page 212: ......
Page 214: ......
Page 216: ......
Page 218: ......
Page 220: ......
Page 222: ......
Page 224: ......
Page 228: ......
Page 230: ......
Page 232: ......
Page 234: ......
Page 240: ......