Ref.: WB-VL-SM Ver.1 3.doc
4
2.3.
UNPACKING
1.
Unpack the Main cabinet corrugated box
2.
Un-wrap the VCI sheet from Main cabinet.
3.
Remove all the four bolts from Main cabinet base to take it out from pallet.
4.
Ensure the contents as per the packing list
2.3.1. LCV MODELS
Package
No.
Package
description
Package contents
Qty
1
Main cabinet
corrugated box
1. Main cabinet assembly
1 No.
2. Monitor
1 No.
3. Monitor column
1 No.
4. Wheel guard with pipe & DMR
1 No.
5. Width caliper
1 No.
6. Width measuring rod (For Prem/+ model)
1 No.
7. Accessories box (Cabinet right side)
containing:
a) MCD & QCLN parts
b) Cone holding stem
c) Wheel seating cones
d) Wheel guard bracket
e) DMR spacer, ALU-2P/3P
f) Rubber hub cover
g) Wheel balancing weight
h) Foundation fasteners
i) Glass fuses
1 Set
3 No.
3 No.
1 No.
1 No.
1 No.
1 Set
1 Set
1 Set
1
2
4
6
5
7
3
Fig. 2
Summary of Contents for LX WB-VL-65 DSP
Page 48: ...Ref WB VL SM Ver 1 3 doc 45 7 DIAGRAMS 7 1 BLOCK DIAGRAM 7 1 1 LCV MODELS Fig 99...
Page 49: ...Ref WB VL SM Ver 1 3 doc 46 7 1 2 HCV MODEL THREE PHASE OPERATION Fig 100...
Page 50: ...Ref WB VL SM Ver 1 3 doc 47 SINGLE PHASE OPERATION Fig 101...
Page 51: ...Ref WB VL SM Ver 1 3 doc 48 7 2 WIRING DIAGRAM 7 2 1 LCV MODELS Fig 102 1 of 3...
Page 52: ...Ref WB VL SM Ver 1 3 doc 49 Fig 102 2 of 3...
Page 53: ...Ref WB VL SM Ver 1 3 doc 50 Fig 102 3 of 3...
Page 54: ...Ref WB VL SM Ver 1 3 doc 51 7 2 2 HCV MODEL THREE PHASE OPERATION Fig 103 1 of 3...
Page 55: ...Ref WB VL SM Ver 1 3 doc 52 Fig 103 2 of 3...
Page 56: ...Ref WB VL SM Ver 1 3 doc 53 SINGLE PHASE OPERATION Fig 103 3 of 3...