Ref.: WB-VL-SM Ver.1 3.doc
34
4.
Remove the Rotor fixing bolt and detach the Rotor assembly from cabinet.
Fig. 70
5.
Fixing the new Rotor assembly with Cabinet & fasten it firmly.
Fig. 71
6.
Fixing the SB Screw rod with the Rotor & tighten it firmly with nut. Before
fastening the Sensor nut, ensure the SA & SB screw rods are centered in the
slotted hole in Cabinet:
Fig. 72
7.
Fix the Driven pulley with Main shaft and then put the Belt between Driven &
Motor pulleys.
Fig. 73
8.
Fix the Revolution Index encoder board with Rotor firmly.
9.
Fix the MCD with Main shaft.
Fig. 74
10. Switch on Balancer and calibrate it as explained in Operating manual.
11. Run the Balancing program and ensure the functions are working properly
without any errors.
SB +
SA +
Summary of Contents for LX WB-VL-65 DSP
Page 48: ...Ref WB VL SM Ver 1 3 doc 45 7 DIAGRAMS 7 1 BLOCK DIAGRAM 7 1 1 LCV MODELS Fig 99...
Page 49: ...Ref WB VL SM Ver 1 3 doc 46 7 1 2 HCV MODEL THREE PHASE OPERATION Fig 100...
Page 50: ...Ref WB VL SM Ver 1 3 doc 47 SINGLE PHASE OPERATION Fig 101...
Page 51: ...Ref WB VL SM Ver 1 3 doc 48 7 2 WIRING DIAGRAM 7 2 1 LCV MODELS Fig 102 1 of 3...
Page 52: ...Ref WB VL SM Ver 1 3 doc 49 Fig 102 2 of 3...
Page 53: ...Ref WB VL SM Ver 1 3 doc 50 Fig 102 3 of 3...
Page 54: ...Ref WB VL SM Ver 1 3 doc 51 7 2 2 HCV MODEL THREE PHASE OPERATION Fig 103 1 of 3...
Page 55: ...Ref WB VL SM Ver 1 3 doc 52 Fig 103 2 of 3...
Page 56: ...Ref WB VL SM Ver 1 3 doc 53 SINGLE PHASE OPERATION Fig 103 3 of 3...