Ref.: WB-VL-SM Ver.1 3.doc
32
5.1.5.
SMPS
1.
Disconnect the AC I/P & DC O/P wires.
2.
Remove the fasteners and replace the defective SMPS with New one
and restore the wiring by observing the correct I/P & O/P indications in
SMPS, except the O/P power to DSP Interface board (refer Wiring
diagram - Chapter 7.2).
Fig. 64
3.
Switch ON the Balancer and check the following SMPS voltages at Gnd:
+5V (Tol.: ±0.1V).
4.
Connect the DSP Interface board DC O/P (2Pin Phoenix).
5.
Switch on the Balancer and run the Balancing program to ensure the
functions are working properly without any errors.
5.1.6.
5.1.6.
MCB (HCV)
HCV models (3Phase)
HCV models (1Phase)
Fig. 65
1.
Switch off MCB and disconnect the main power cord (for LCV model). In
case of HCV model, switch off the Mains MCB also.
2.
Remove the top cover from main cabinet and change any one of parts
(EMI module, AC socket & Monitor socket).
3.
For replacement of MCB/Rocker switch, disconnect the I/P & O/P wires
(Line & Neutral).
4.
Ensure the correct I/P & O/P direction in both MCB & Wires while
restoring the connections (Refer Wiring diagram - Chapter 7.2).
5.
Power up the machine and ensure that the equipment functions.
5.1.7.
BUZZER
1.
Remove Buzzer connector from DSP board and replace with new
Buzzer and restore the connector.
2.
Switch on the Balancer and run the Key test program as explained in
Chapter 4.10.
Summary of Contents for LX WB-VL-65 DSP
Page 48: ...Ref WB VL SM Ver 1 3 doc 45 7 DIAGRAMS 7 1 BLOCK DIAGRAM 7 1 1 LCV MODELS Fig 99...
Page 49: ...Ref WB VL SM Ver 1 3 doc 46 7 1 2 HCV MODEL THREE PHASE OPERATION Fig 100...
Page 50: ...Ref WB VL SM Ver 1 3 doc 47 SINGLE PHASE OPERATION Fig 101...
Page 51: ...Ref WB VL SM Ver 1 3 doc 48 7 2 WIRING DIAGRAM 7 2 1 LCV MODELS Fig 102 1 of 3...
Page 52: ...Ref WB VL SM Ver 1 3 doc 49 Fig 102 2 of 3...
Page 53: ...Ref WB VL SM Ver 1 3 doc 50 Fig 102 3 of 3...
Page 54: ...Ref WB VL SM Ver 1 3 doc 51 7 2 2 HCV MODEL THREE PHASE OPERATION Fig 103 1 of 3...
Page 55: ...Ref WB VL SM Ver 1 3 doc 52 Fig 103 2 of 3...
Page 56: ...Ref WB VL SM Ver 1 3 doc 53 SINGLE PHASE OPERATION Fig 103 3 of 3...