Electrification FS Conductor Bar System Instruction Manual
October 2019
Page
20
of
34
Chapter 6.0: Isolation Joint Assembly
6.1: FS-JNIS
6.1.(a):
Verify that the clamping plate is 1/8” below the underside of the isolation joint plastic. If
not, loosen or tighten the nuts to make the adjustment.
6.1.(b):
Slide the joint assembly into upper slot of the end of the line element. Be sure the
clamping plate is properly located in the end of the line element.
6.1.(c):
Slide the next line element into the open end of the joint assembly. Be sure the clamping
plate is properly located in the end of the line element.
6.1.(d):
Ensure that the running surfaces are aligned.
6.1.(e):
Ensure that the end of each bar is touching the isolation joint.
6.1.(f):
Tighten the nuts of the isolation joint assembly to 55 in-lb.
6.1.(g):
Verify each nut on joint is tightened appropriately.
NOTE: Tools Required: 3/8” Wrench or Socket
6.2:
Joint Covers (FS-JNCV)
6.2.(a):
Open joint end cover on each end of the joint (disengage lower locking tabs from each
side of cover).
6.2.(b):
Remove packaging foam.
6.2.(c):
Center joint cover over the isolation joint assembly.
6.2.(d):
With light pressure, open the bottom of the joint cover sufficient to clear the sides of the
line element. Damage may occur to joint cover if it is spread beyond 1¼” wide.