SIGMA LASER STENT AND TUBE CUTTER
990-401
17
SECTION III. OPERATION
START UP
1.
Before energizing the system verify that there are no foreign objects on the motion system axis
such as tools, laser glasses or other materials.
2.
Verify that all external connections are in place and ON, such as shop air and gas assist supply.
3.
Verify main customer supplied power is ON.
4.
Turn the system rear mounted main breaker to the ON position.