SECTION II. INSTALLATION AND SETUP
UNCRATING THE SYSTEM
1.
Inspect the crate for any physical damage from shipping.
2.
Photograph and document any damage.
3.
Report and damage to the responsible individual .
4.
When removing the system from the crate make sure the fork lift forks are past the back of the
system.
5.
Physically inspect the system for any signs of damage or shifting during shipping. Photograph
and document, and report any damage found.
SYSTEM INSTALLATION AND TESTING
Different States, Cities, and Counties may have safety and fire regulations specific to their locations.
Because of this the customer should verify that the installation instructions meet or exceed local code
and safety requirements.
1.
Move the system to the final location
2.
Insure that there is a minimum distance of 2 feet of clearance around the system. While 2 feet
in the minimum distance 3 feet is the recommended clearance. See
Appendix A. System
Dimensions
for reference.
3.
With the system door open insure that there is no overhead interference such as light fixtures,
electrical conduit, air lines/hoses, and or pipes or plumbing of any type.
4.
Place a level on the system composite base.