![Mada Sigma Series Operation Manual Download Page 19](http://html.mh-extra.com/html/mada/sigma-series/sigma-series_operation-manual_687919019.webp)
SIGMA LASER STENT AND TUBE CUTTER
990-401
5
6.
Insure and table/axis locks have been removed and there are no obstructions on or around the
axis.
7.
Locate the main breaker on the facilities panel on the back of the machine, turn the switch off.
8.
Connect the systems supplied 3 wire, 8 AWG SOOW cable to the customer supplied 208-240
Volt single phase 40 amp breaker.
NOTE:
Most fire departments require 3 feet of floor clearance around electrical supply panels