10. Secure the plate support (A) to the frame channel (B)
using the four bolts and nuts previously removed.
11. Remove sling from the hose management arm.
Figure 3.7: Hose Management Arm Plate
Support
12.
30–35 Foot Headers:
Remove the two bolts (A)
and shipping support (B) from the coupler holder (C).
Discard shipping support (B) and reinstall the two bolts
on the same location on the coupler holder to secure
the hose cover.
Figure 3.8: Hose Management Arm Shipping
Support Bracket (30–35 Foot Headers)
13. Cut the cable tie securing the hoses in position (A), and
secure the hoses with the strap (A) bolted on the frame.
IMPORTANT:
Note the routing of the hoses in the hose
management arm field position in Figure
Hose Management Arm Hose Routing – Top
View, page 20
.
Figure 3.9: Hose Management Arm Hose
Routing – Top View
214017
20
Revision A