1.
Position sling (A) around the reel tube (B) close to the
outboard end of reel and attach sling to a forklift (or
equivalent).
2.
Remove shipping wire/banding from the reel lift
cylinder.
Figure 4.3: Reel Tube
3.
Lift reel and remove two top bolts (A) on outboard reel
arm supports. Repeat for opposite side.
Figure 4.4: Outboard Reel Arm Support
4.
Double-reel headers only:
Lift reel and remove two
top bolts (A) on center reel arm to allow the center reel
arm to move.
Figure 4.5: Center Reel Arm: Double-Reel
Header Only
214017
38
Revision A