![MacDon D130XL Assembly Instructions Manual Download Page 24](http://html.mh-extra.com/html/macdon/d130xl/d130xl_assembly-instructions-manual_685666024.webp)
4.
Remove the two bolts and nuts (A) securing the
base of the hose management arm (B) to the frame
channel (C).
5.
Remove the other two bolts and nuts (D) from the plate
support (E).
6.
Retain bolts and nuts for use later.
Figure 3.3: Hydraulic Hose Management Arm
Base Frame
7.
30–35 Foot Headers:
With the sling supporting the
hose management arm (A), remove the two bolts and
nuts (B) that secure it to the shipping support (C).
Figure 3.4: Hydraulic Hose Management Arm in
Shipping Position (30–35 Foot Headers)
214017
18
Revision A