3.3
Installing Gauge Rollers
If kit is
NOT
supplied, proceed to
3.4 Lowering the Header, page 11
. Otherwise, proceed as follows.
NOTE:
This kit may be installed later in the header assembly sequence, but it may be easier prior to laying the
header down.
1.
Unpack gauge roller bundle.
2.
Remove two locking pins (A) from each assembly.
3.
Remove nuts, bolts, and clips (B) from assembly.
Figure 3.5: Gauge Roller in Shipping
Configuration
4.
Insert tabs on roller assembly into slots (A) on cutterbar
at outboard mounting locations on frame.
Figure 3.6: Gauge Roller Mounting Location
147913
9
Revision A
Summary of Contents for A40-D
Page 2: ...A40 D Self Propelled Windrower Auger Header Published May 2016 ...
Page 76: ......
Page 100: ......
Page 119: ......