To unload the header, follow these steps:
1.
Remove hauler’s tie-down straps and chains.
2.
Approach header from either its underside or topside
and slide forks (A) in underneath lifting framework as
far as possible.
NOTE:
When possible, approach from the underside to
minimize potential for scratching the unit.
3.
Raise header off deck.
IMPORTANT:
If load is “two wide”, take care not to contact the
other machine.
Figure 2.1: Forks in Position
4.
Back up until unit clears trailer and slowly lower to
150 mm (6 in.) from ground.
5.
Take to storage or setup area.
6.
Set header down securely on level ground.
7.
Repeat for other header if required.
8.
Check for shipping damage and missing parts.
Figure 2.2: Topside of Header in Shipping
Configuration
Figure 2.3: Underside of Header in Shipping
Configuration
147913
6
Revision A
Summary of Contents for A40-D
Page 2: ...A40 D Self Propelled Windrower Auger Header Published May 2016 ...
Page 76: ......
Page 100: ......
Page 119: ......