4.
Move hose/electrical bundle (A) to header.
5.
Route bundle (A) from windrower through support (B)
and access hole (C) in header frame alongside existing
hose bundle (D) from header.
6.
Remove cover on header electrical receptacle (E).
7.
Push connector onto receptacle, and turn collar on
connector to lock it in place.
8.
Attach cover to mating cover on windrower wiring
harness.
9.
Remove caps from hydraulic couplers.
Clean
if necessary.
Figure 3.67: Hose and Electrical Bundle – 14-Ft.
and 16-Ft. Header Shown (18-Ft. Similar)
NOTE:
At location (C), later-build 2015 units will have a “tee”
going to case drain on square reel motor only.
10. Push hose connectors onto mating receptacles as
shown until collars on receptacles snap into lock
position.
Figure 3.68: Early-Build 2015, 2014, and Earlier
Standard Header – 14-Ft. and 16-Ft. Header
Shown (18-Ft. Similar)
A - Reel and Auger Pressure
B - Knife and Conditioner Return
C - Case Drain
D - Knife and Conditioner Pressure
147913
37
Revision A
Summary of Contents for A40-D
Page 2: ...A40 D Self Propelled Windrower Auger Header Published May 2016 ...
Page 76: ......
Page 100: ......
Page 119: ......