Installation
Completing the installation
16
© Lutz-Jesco GmbH 2018
BA-24721-02-V02
Chlorine gas changeover unit
C 7523
Operating instructions
7.8 Installation with a positive pressure manifold
M
Fig. 14: Installation with a positive pressure manifold
Position
Description
Position
Description
A
Room for the chlorine gas supply
8
Changeover unit with 5 service valves
B
Dosing device room
9
Dosing device
1
Chlorine barrel
10
Injector with non-return valve
2
Chlorine barrel scale
11
Motive water pump
3
Pressurised manifold
12
Gas warning device
4
Chlorine gas filter
13
Horn
5
Moisture eliminator with heating collar
14
Gas sensor
6
Vacuum regulator
15
Entrance port of the chlorine eliminator
7
Activated carbon cartridge
Table 17: Designation of components
7.9 Completing the installation
The cable screw connections must be tightened after assembly in order
to ensure the IP protection class of the installation. All union nuts on the
screw connections of the piping are tightened by hand.
A
B
12
1
2
3
6
8
7
9
10
13
5
11
15
4
14