Motor connection
In its delivery state, the motor of the ball valve is connected in accordance
with the following plan.
1
2
3
2
3
1
BK
BN
GY
GNYE
BK
GY
BN
Fig. 9: Motor connection
Position
Description
A
Control circuit board
B
Large plug on the motor
C
Small plug on the motor
Table 13: Motor connection
7.5 Installation examples
Fig. 10: Installation example
Item
Description
1
Dosing device
2
Reaction section (L = DN x 10)
3
Injector non-return valve C 3101
4
Angle piece
5
Injector
6
Reaction section (L = DN x 5)
Table 14: Components
7.6 Installation with bypass
The volume to be removed from a supply battery is limited by the number
of pressure tanks connected. To prevent the unnecessary connection of
too many pressure tanks, in the majority of cases, the supply battery is
designed for normal operation. Such installations are fitted with a bypass
valve for higher volumes required at short notice (e.g. a shock chlorina-
tion). It is thus possible to extract from both supply batteries simultane-
ously.
Fig. 11: Installation with bypass valves
If the dosing system is also to be operated whilst maintenance is per-
formed on the changeover unit, 5 manual valves are required in the pipe
line.
Fig. 12:
A
A
A
B
B
Installation with 5 service valves
Check
valve
In normal operation
During service
A
Open
Closed
B
Closed
Manual switching
Table 15: Function of the service valves
A
C
B