Lucent Technologies Victory Class Batteries WP-93936
Issue 1 May 2000
Installation 6 - 19
Installing Front Restraint Rail (Seismic Only)
Front Restraint Rail
(Seismic Only)
6. With the batteries in place, slide the front side support rail and
cover up from its resting location to its mounting location,
aligning with rear side restraint rail. Install hardware and torque
to 15-20 ft.-lbs. See Figure 6-10.
Figure 6-10: Installed Front Restraint Rail
Restraint Rails and
Cover (Installed)