Lucent Technologies Lineage
®
2000 25A Ferroresonant Rectifier J85502A-1
Issue 4 May 1998
Testing 6 - 7
Testing Off
Line
The following tests involve use of the test load and a Battery
Plant Simulator Test Set. Refer to the paragraphs above headed
“Battery Plant Simulator Test Set,” “Test Load Connection,”
and “Preparation for Testing Off Line” for the procedure to
connect a test load and for a Battery Plant Simulator Test Set.
Startup
1. Turn On the ac supply to the rectifier. The PWR lamp on
the test set should light brightly. If it does not light
properly, check the connection of the two small red and
black clip leads. They may be reversed or otherwise
incorrectly connected. These leads provide the operating
voltages in the test set, and the red lead should be
approxi27 volts dc with respect to the black lead.
2. The PWR lamp should remain lit during the remaining
tests as long as the ac supply is turned On.
Figure 6-3: CM2 Control Board Showing Test Clip Connections
and Other Component Detail
E14
E13
C1
C2
C21
C22
C24
C20
R52
P1A
P2A
R31
IC3
CR25
R70
C16
C14
E5
E15
R35
E17
E7
E6
E16
CR27
CR28
CR29
R22
R23
P4
C4
P3A
Black Test Clip
Red Test Clip
Connection for J2A on
Plant Control Cable
Connection for J3A from
CM3 Digital Meter Board
Internal Selective
HVSD Potentiometer
Isolated Current
Measuring Potentiometer
Connection for J1A
from CM1 Option Board
Current Limit Capacitor
and Potentiometer
Note
If the rectifier fails any of the tests described below, replace
the CM2 control board (see Section 8) and begin testing again.