Lucent Technologies Lineage
®
2000 25A Ferroresonant Rectifier J85502A-1
2 - Table of Contents
Issue 4 May 1998
Installing or Adding a Rectifier
Installing Plant Control Cable Assembly for a
Lucent Technologies Controller
Converting AC Voltage (Optional)
Initial Battery Charging (Optional)
Battery Plant Simulator Test Set
Preparation for Testing Off Line
Regulation (NL/FL) Test (Off Line)
Rectifier Failure Alarm/Fuse Alarm Test (Off Line)
Backup High Voltage Shutdown (HVSD) Test
Selective High Voltage Shutdown (SHVSD) and
Meter Calibration Test (Off Line)
Test for 434A or 434B Circuit Module
Bringing the Rectifier On Line
Regulation (NL/FL) Test (On Line)
Rectifier Failure Alarm/Fuse Alarm Test (On Line)
Isolated Current Measuring (VI) Test (MCS or
Backup High Voltage Shutdown (HVSD) Test
Meter Calibration Test (On Line)
Adjusting Rectifiers to Float Voltage
Adjusting Rectifiers Individually