Lucent Technologies Lineage
®
2000 25A Ferroresonant Rectifier J85502A-1
5 - 6 Installation
Issue 4 May 1998
5. With rectifier lying on its back, open the front door and
visually inspect for shipping damage.
6. If material is damaged, contact shipping company and
process claims form.
7. Verify that the main ac voltage at the distribution panel
agrees with the List options specified on the label inside
the front door of the rectifier. If it does not agree, the
customer may decide to correct the problem instead of
returning the rectifier. The procedure for rewiring the ac
input connections to match the customer's ac supply (208
or 240 volts) is provided in Section 5.
8. Verify that the CM1 option board has straps present or
removed according to the options you expect. See Table
8-B in this manual or Tables A and R on J-drawing,
J85502A-1.
Installing or
Adding a
Rectifier
Before beginning this procedure, read the “Preparing for
Installation” section in its entirety. This procedure is appropriate
for installing a rectifier in a new plant or adding a rectifier to an
existing plant to increase capacity. The assumption is made,
however, that the rectifier is being added to an operating plant.
Observe the safety precautions in Section 4 and those with each
procedure whenever working on or near electrically live
equipment. Only persons trained and experienced in the
installation of power equipment should install this rectifier.
Installing AC
Power Cables
Use Figures 5-1 and 5-2 as references for this section.
1. Using site drawing information, place the rectifier in the
exact position specified for the unit.
2. Disconnect ac power from ac distribution service panel
that supplies power to the rectifier.
3. Install fuse holders or circuit breaker for the rectifier in the
ac distribution service panel. Leave circuit breaker in Off
position or remove fuses.