............................................................................................................................................................
3
Switch the right circuit breaker of the subrack (located on the rear) to
the ON position (= 1).
Figure 5-1 PI switching
Power initialisation
Switching on and testing supply voltage
Powering, circuit pack installation, and NE software
download
....................................................................................................................................................................................................................................
365-374-074
Issue a, April 2002
Lucent Technologies
5 - 5