5
Powering, circuit pack
installation, and NE software
download
Overview
....................................................................................................................................................................................................................................
Purpose
This chapter describes the powering of the LambdaUnite
™
MultiService Switch (MSS) system, the circuit pack installation, the
NE software installation and two final tests which should be
performed to end the physical installation part.
Assumption
All NEs must be mounted and cabled correctly (see Chapters 3 and
4).
Contents
Switching on and testing supply voltage
Slot positions of the circuit packs
Physical and power installation exit checklist
....................................................................................................................................................................................................................................
365-374-074
Issue a, April 2002
Lucent Technologies
5 - 1