............................................................................................................................................................
10
Verify that all parameters are correct. Click the
Apply
pushbutton and
then
Yes
in the confirmation window.
Result:
If the creation of the MS-SPRing protection group was
successful, a DCC termination provisioning message appears
indicating that the LAPD role has been set at user-side.
............................................................................................................................................................
11
Click
OK
, then click on
Close
.
............................................................................................................................................................
12
Repeat
to
for all other NEs within the ring.
............................................................................................................................................................
13
Verify the correct configuration via
View
→
Rings
→
Ring Maps...
in
the WaveStar® CIT
System View
.
Creating cross-
connections
Important! You must have at least a priviledge code of P3 to perform
this task.
Proceed as follows to create the required cross-connections:
............................................................................................................................................................
1
Login to the NE-A as described in Chapter 6, section
............................................................................................................................................................
2
Set up a cross-connection by calling up the
Cross-Connection
Wizard
via
Configuration
→
Cross-Connections...
in the
System
View
of the WaveStar
®
CIT.
............................................................................................................................................................
3
Click on the radio button
Create a new cross-connection
and click
on
Next>
.
Result:
Screen 1
appears.
SDH test procedures
Point to point / Ring testing
Span / Ring testing
....................................................................................................................................................................................................................................
365-374-074
Issue a, April 2002
Lucent Technologies
8 - 2 3
E
N D
O F
S
T E P S
............................................................................................................................................................