7
Stand alone test procedures
Overview
....................................................................................................................................................................................................................................
Purpose
This chapter describes all the tests that should be carried out to check
the functionality of the NEs.
Assumptions
Be sure all listed assumptions described below are fulfilled before
carrying out any tests:
•
All NEs must be mounted and cabled correctly (see Chapters 3
and 4).
•
The people carrying out the tests are familiar with LambdaUnite
MSS, the SDH or SONET functionality, the WaveStar
®
CIT
software and the handling of the test equipment.
Contents
Port transmission test (daisy chain test)
Optical output power measurements
NE provisioning and stand alone installation test
exit checklist
....................................................................................................................................................................................................................................
365-374-074
Issue a, April 2002
Lucent Technologies
7 - 1