Lucent Technologies Lineage
®
2000 ECS/GPS Battery Plant J85500G-2
4 - 6 Installation
Issue 6 May 1999
Battery stand
assembly
WARNING:
DO NOT CONNECT BATTERIES
TO THE SYSTEM AT THIS TIME.
Assemble battery stands or shelves as instructed in the Lucent
Technologies VR Battery manual or other battery
manufacturer’s documentation. Install the batteries onto their
stands or into their shelves.
Initial charge
Batteries may undergo initial charging at this time, according to
the manufacturer's recommendations. One of the rectifiers may
be used for initial charging. Refer to the procedure given in the
Rectifier manual.
Cable support
and ground
system
Hang all cable support systems, as well as any auxiliary ground
bus bars, as dictated by the job application drawings.
Controller and
LVD set-up
Follow the controller set-up procedure given in the ECS or
Galaxy Controller manual to complete the steps below.
1. Enable/disable equalize charge set-up
2. Enable/disable rectifier restart set-up
Figure 4-2: Floor mounting template (all dimensions are given in inches)
REAR OF BAY
2.38
2
3.25
7.25
12
2.5
2
2
21
26
18mm DIA X 100mm DEEP
(.750 DIA X 4.0 DEEP ALLOWED
AS SUBSTITUTE)
CONCRETE EDGE TO HOLE CENTER
DISTANCE TO BE AT LEAST 2.50 INCHES
DRILL 4 HOLES, POSITION 1. IF INTERFERENCE
IN REINFORCED CONCRETE OCCURS, USE POSITION
2, 3, OR 4 IN THAT ORDER.
J85500G-2
BASE
2
2
2
2
2
2
2
2
2
4
4
4
4
4
4
4
4
1
1
1
1
1
1
1
1
3
3
3
3
3
3
3
3
ED-83242-31
VR BATTERY
BASE